The stream flow record for a hydropower development site is given below. Draw a flow duration curve and determine firm and secondary energy if the available head is 60 m, design discharge capacity is 45 m³/s, and overall efficiency is 82%. [8]
| Months | Jan | Feb | Mar | Apr | May | Jun | July | Aug | Sept | Oct | Nov | Dec |
| Q (m³/s) | 30 | 38 | 28 | 22 | 16 | 32 | 56 | 72 | 54 | 46 | 38 | 36 |