TU IOE · EE 703
Power Plant Equipment
- Chapters
- 8
- Questions
- 195
Past questions by syllabus
Hydro Power Plant
Energy Conversion from Hydraulic to Electrical Terminologies
1 question- 2068 BaishakhChapter 1: Hydro Power Plant1.1 Energy Conversion from Hydraulic to Electrical TerminologiesClick to unlock premiumSee the full question with a premium plan
Steady State Operation of Hydro Power Plant
2 questions- 2073 Shrawan2070 AshadhChapter 1: Hydro Power Plant1.2 Steady State Operation of Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 1: Hydro Power Plant1.2 Steady State Operation of Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
Water Hammer and Surge Tank in Hydro Power Plant
6 questions- 2072 ChaitraChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
- 2076 Chaitra2071 ChaitraChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power Plant
What do you mean by water hammer in context of hydro power plant? How can it be minimized?
- 2082 BaishakhChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 1: Hydro Power Plant1.3 Water Hammer and Surge Tank in Hydro Power PlantClick to unlock premiumSee the full question with a premium plan
Control of Water Delivery to Turbine
1 question- 2070 ChaitraChapter 1: Hydro Power Plant1.4 Control of Water Delivery to TurbineClick to unlock premiumSee the full question with a premium plan
Transient in Turbine-Generator System
6 questions- 2081 BhadraChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
- 2076 ChaitraChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 1: Hydro Power Plant1.5 Transient in Turbine-Generator SystemClick to unlock premiumSee the full question with a premium plan
Pump Storage Plant
3 questions- 2081 Bhadra2076 Chaitra2075 Chaitra2074 Chaitra2072 Chaitra2072 Kartik2071 Chaitra2069 Chaitra2068 BaishakhChapter 1: Hydro Power Plant1.6 Pump Storage Plant
Explain the operation of pump storage plant with a neat diagram. Is this type of power plant feasible/economical to install in Nepal's power system? Justify/support your answer with appropriate reasons.
- 2080 BaishakhChapter 1: Hydro Power Plant1.6 Pump Storage PlantClick to unlock premiumSee the full question with a premium plan
- 2079 Baishakh2078 BhadraChapter 1: Hydro Power Plant1.6 Pump Storage PlantClick to unlock premiumSee the full question with a premium plan
Generator for Hydro Power Plants
2 questions- 2068 BaishakhChapter 1: Hydro Power Plant1.7 Generator for Hydro Power PlantsClick to unlock premiumSee the full question with a premium plan
- 2068 BaishakhChapter 1: Hydro Power Plant1.7 Generator for Hydro Power PlantsClick to unlock premiumSee the full question with a premium plan
Power/Frequency Control in Hydro Generator System
f and Q-V Control Loop of Hydro Generating System
1 question- 2079 Baishakh2073 Shrawan2071 ShrawanChapter 2: Power/Frequency Control in Hydro Generator System2.1 f and Q-V Control Loop of Hydro Generating System
Draw and explain the P-F and Q-V control loop of a hydro generating system.
Modeling of Turbine
3 questions- 2079 BhadraChapter 2: Power/Frequency Control in Hydro Generator System2.2 Modeling of TurbineClick to unlock premiumSee the full question with a premium plan
- 2068 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.2 Modeling of TurbineClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.2 Modeling of TurbineClick to unlock premiumSee the full question with a premium plan
Special Characteristics of Hydraulic Turbine
1 question- 2072 KartikChapter 2: Power/Frequency Control in Hydro Generator System2.3 Special Characteristics of Hydraulic TurbineClick to unlock premiumSee the full question with a premium plan
Modeling of Governor
2 questions- 2071 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4 Modeling of GovernorClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4 Modeling of GovernorClick to unlock premiumSee the full question with a premium plan
Generator Response to Load Change
2 questions- 2075 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.2 Generator Response to Load ChangeClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.2 Generator Response to Load ChangeClick to unlock premiumSee the full question with a premium plan
Isochronous Governor
9 questions- 2082 Baishakh2072 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous Governor
Derive transfer function for speed response for load change in turbine generator set in the absence of governor. Also explain how isochronous governor can be incorporated together with turbine and generator with block diagram.
- 2075 AshwinChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2069 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2078 Bhadra2071 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous Governor
What do you mean by Isochronous Governor? What will be the problem if two hydropower plants with isochronous governor are operated in parallel to supply a common load?
- 2071 ShrawanChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.3 Isochronous GovernorClick to unlock premiumSee the full question with a premium plan
Governor with Droop Characteristics
1 question- 2076 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.4 Governor with Droop CharacteristicsClick to unlock premiumSee the full question with a premium plan
Load Sharing by Parallel Unit
17 questions- 2069 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2070 AshadhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2068 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2075 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2075 Ashwin2071 Chaitra2070 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel Unit
Two generators of 250 MW and 500 MW capacities respectively are operating in parallel and connected to a common bus. When each generator is half loaded, they operate at a common frequency of 50 Hz. Their droop characteristics are 4% and 2% respectively. When the system load is increased, the frequency decreases to 49.5 Hz. Calculate the increase in system load and load shared by each generator.
- 2072 KartikChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2079 BaishakhChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 2: Power/Frequency Control in Hydro Generator System2.4.5 Load Sharing by Parallel UnitClick to unlock premiumSee the full question with a premium plan
Var/Voltage Control in Hydro Generating Systems
Types of Excitation Systems
2 questions- 2069 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.1 Types of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 3: Var/Voltage Control in Hydro Generating Systems3.1 Types of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
AC Excitation System
1 question- 2075 AshwinChapter 3: Var/Voltage Control in Hydro Generating Systems3.1.2 AC Excitation SystemClick to unlock premiumSee the full question with a premium plan
Static Excitation System
1 question- 2071 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.1.3 Static Excitation SystemClick to unlock premiumSee the full question with a premium plan
Modeling of Excitation Systems
11 questions- 2072 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2081 Baishakh2080 Baishakh2079 Bhadra2070 AshadhChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation Systems
Describe the excitation system of a synchronous generator with stabilizing transformer. Derive mathematical model of the system in terms of transfer function of each component of the system.
- 2068 BaishakhChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2075 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2082 Baishakh2076 Chaitra2074 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation Systems
Explain the dynamic response of excitation system with suitable/stabilizing transformer with suitable mathematical deduction.
- 2079 Baishakh2073 Shrawan2071 ChaitraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation Systems
Derive the transfer function of an excitation system with stabilizing transformer.
- 2072 KartikChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 3: Var/Voltage Control in Hydro Generating Systems3.2 Modeling of Excitation SystemsClick to unlock premiumSee the full question with a premium plan
Substation Equipment
Power Transformer and Its Various Components
3 questions- 2072 ChaitraChapter 4: Substation Equipment4.1 Power Transformer and Its Various ComponentsClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 4: Substation Equipment4.1 Power Transformer and Its Various ComponentsClick to unlock premiumSee the full question with a premium plan
- 2079 BaishakhChapter 4: Substation Equipment4.1 Power Transformer and Its Various ComponentsClick to unlock premiumSee the full question with a premium plan
Reactor Used in Generating Station and Substation
19 questions- 2069 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2075 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2075 Ashwin2071 ShrawanChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and Substation
Figure below shows a bus-bar reactor scheme. If a 3 phase to ground fault occurs on the outgoing feeder, calculate the fault current (in kA) supplied by each generator and fault MVA required for the circuit breaker (CB) on the feeder. Ratings: G1: 30 MVA, 11 kV, Xg1=0.1 pu; G2: 50 MVA, 11 kV, Xg2=0.1 pu.

- 2071 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2072 KartikChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2079 BaishakhChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
- 2076 ChaitraChapter 4: Substation Equipment4.4 Reactor Used in Generating Station and SubstationClick to unlock premiumSee the full question with a premium plan
Fire Fighting System in Power Station
6 questions- 2068 BaishakhChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
- 2075 AshwinChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 4: Substation Equipment4.5 Fire Fighting System in Power StationClick to unlock premiumSee the full question with a premium plan
Power Line Carrier Communication (PLCC)
1 question- 2071 ChaitraChapter 4: Substation Equipment4.6 Power Line Carrier Communication (PLCC)Click to unlock premiumSee the full question with a premium plan
Supervisory Control and Data Acquisition (SCADA) System and Communication with Load Dispatch Center
3 questions- 2074 Chaitra2070 AshadhChapter 4: Substation Equipment4.8 Supervisory Control and Data Acquisition (SCADA) System and Communication with Load Dispatch CenterClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 4: Substation Equipment4.8 Supervisory Control and Data Acquisition (SCADA) System and Communication with Load Dispatch CenterClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 4: Substation Equipment4.8 Supervisory Control and Data Acquisition (SCADA) System and Communication with Load Dispatch CenterClick to unlock premiumSee the full question with a premium plan
Other questions
1 question- 2068 BaishakhChapter 4: Substation EquipmentClick to unlock premiumSee the full question with a premium plan
Diesel Power Plant
Diesel Cycle
1 question- 2080 BaishakhChapter 5: Diesel Power Plant5.1 Diesel CycleClick to unlock premiumSee the full question with a premium plan
Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and Governing
18 questions- 2079 Bhadra2075 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and Governing
Make/sketch/draw a layout/complete sketch of a diesel power plant showing the following systems and briefly discuss about them: (i) Air intake system (ii) Cooling system (iii) Fuel supply system (iv) Lubrication system (v) Exhaust system.
- 2074 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2071 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2079 BaishakhChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2069 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2070 AshadhChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2072 KartikChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
- 2076 ChaitraChapter 5: Diesel Power Plant5.2 Diesel Engine Operation, Starting, Fuel Storage and Supply System, Cooling System, Noise Abatement and GoverningClick to unlock premiumSee the full question with a premium plan
Performance of Diesel Power Plant
17 questions- 2069 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2070 AshadhChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2068 BaishakhChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2072 KartikChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2071 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2081 Bhadra2078 BhadraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power Plant
In a test for four-cylinders four-stroke engine: diameter=100 mm, stroke=120 mm, speed=1800 rpm, fuel=0.2 kg/min, CV=44000 kJ/kg, tension difference=40 kg, brake circumference=300 cm, mechanical efficiency=90%. Determine: i) Brake thermal efficiency ii) Indicated thermal efficiency iii) IMEP iv) BSFC.
- 2080 BhadraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2076 ChaitraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 5: Diesel Power Plant5.3 Performance of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
Advantages and Disadvantages of Diesel Power Plant
1 question- 2075 AshwinChapter 5: Diesel Power Plant5.5 Advantages and Disadvantages of Diesel Power PlantClick to unlock premiumSee the full question with a premium plan
Gas Turbine Power Plant
Gas Turbine Cycle; Open and Closed Cycles
7 questions- 2068 BaishakhChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2075 ChaitraChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2075 AshwinChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2073 ShrawanChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2079 BaishakhChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed CyclesClick to unlock premiumSee the full question with a premium plan
- 2080 Bhadra2079 BaishakhChapter 6: Gas Turbine Power Plant6.1 Gas Turbine Cycle; Open and Closed Cycles
Air is drawn in a gas turbine unit at 15°C, 100 kPa and pressure ratio is 7:1. Compressor is driven by HP turbine and LP turbine drives a separate power shaft. Isentropic efficiencies of compressor, HP and LP turbines are 0.82, 0.85 and 0.85. Maximum temperature=610°C. Calculate: a) Pressure and temperature entering LP turbine b) Net power per kg/s c) Thermal efficiency. [Cp=1.005 kJ/kg·K, γ=1.4 (compression); Cp=1.15 kJ/kg·K, γ=1.333 (expansion)]
Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and Reheating
14 questions- 2069 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2070 AshadhChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2070 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2081 Bhadra2071 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and Reheating
A gas turbine plant of 800 kW takes air at 100 kPa and 288 K with flow rate 6 kg/s. Pressure ratio=6, maximum temperature=900 K, regenerator effectiveness=80%, isentropic efficiencies of compressor and turbine=85%. Determine plant thermal efficiency and net power. Take Cp=1.005 kJ/kg·K and γ=1.4.
- 2076 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2081 BaishakhChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2071 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2079 Bhadra2076 ChaitraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and Reheating
Explain how regenerator/regeneration increases the output of the gas turbine power plant along with the neat sketch and show the cycle in P-V and T-S diagram.
- 2078 BhadraChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 6: Gas Turbine Power Plant6.2 Performance Improvement of Gas Turbine Power Plants; Intercooling, Regeneration and ReheatingClick to unlock premiumSee the full question with a premium plan
Thermal (Steam) Power Plant
Rankine Cycle
4 questions- 2080 BaishakhChapter 7: Thermal (Steam) Power Plant7.1 Rankine CycleClick to unlock premiumSee the full question with a premium plan
- 2070 AshadhChapter 7: Thermal (Steam) Power Plant7.1 Rankine CycleClick to unlock premiumSee the full question with a premium plan
- 2072 KartikChapter 7: Thermal (Steam) Power Plant7.1 Rankine CycleClick to unlock premiumSee the full question with a premium plan
- 2071 ShrawanChapter 7: Thermal (Steam) Power Plant7.1 Rankine CycleClick to unlock premiumSee the full question with a premium plan
Performance Analysis, Superheating Reheating and Regeneration
8 questions- 2069 ChaitraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
- 2075 ChaitraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
- 2081 Baishakh2072 Kartik2071 Chaitra2070 ChaitraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and Regeneration
List the common method(s) used for the performance improvement of the steam turbine power plant(s). Explain how reheating increases efficiency of the plant.
- 2082 Baishakh2079 Baishakh2073 ShrawanChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and Regeneration
Explain how reheater/reheating increases the output of the steam turbine power plant along with neat sketch. Draw the layout and show the cycle in T-S diagram.
- 2081 BhadraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
- 2080 BhadraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
- 2079 BhadraChapter 7: Thermal (Steam) Power Plant7.2 Performance Analysis, Superheating Reheating and RegenerationClick to unlock premiumSee the full question with a premium plan
Steam Turbine: Classifications, Compounding, Governing and Lubrication Systems for Steam Turbines
3 questions- 2068 BaishakhChapter 7: Thermal (Steam) Power Plant7.3 Steam Turbine: Classifications, Compounding, Governing and Lubrication Systems for Steam TurbinesClick to unlock premiumSee the full question with a premium plan
- 2075 Chaitra2074 ChaitraChapter 7: Thermal (Steam) Power Plant7.3 Steam Turbine: Classifications, Compounding, Governing and Lubrication Systems for Steam Turbines
Differentiate between the operation of / What is the fundamental difference between the operation of impulse and reaction turbines?
- 2075 AshwinChapter 7: Thermal (Steam) Power Plant7.3 Steam Turbine: Classifications, Compounding, Governing and Lubrication Systems for Steam TurbinesClick to unlock premiumSee the full question with a premium plan
Advantages and Disadvantages Thermal Power Plants
1 question- 2074 ChaitraChapter 7: Thermal (Steam) Power Plant7.4 Advantages and Disadvantages Thermal Power PlantsClick to unlock premiumSee the full question with a premium plan
Combined Power Plant
Gas and Steam Turbine Combined Cycle
9 questions- 2076 Chaitra2070 Chaitra2069 ChaitraChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined Cycle
Sketch the basic components of a combined power plant. Also sketch the corresponding processes on T-s diagram.
- 2071 Shrawan2070 AshadhChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined Cycle
List the common methods employed to utilize waste heat in combined power plants.
- 2068 BaishakhChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2072 ChaitraChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2072 KartikChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2071 ChaitraChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2082 BaishakhChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2081 BhadraChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2080 BaishakhChapter 8: Combined Power Plant8.1 Gas and Steam Turbine Combined CycleClick to unlock premiumSee the full question with a premium plan
Advantages of Combined Cycle
5 questions- 2075 ChaitraChapter 8: Combined Power Plant8.2 Advantages of Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2074 ChaitraChapter 8: Combined Power Plant8.2 Advantages of Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2075 AshwinChapter 8: Combined Power Plant8.2 Advantages of Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2080 Bhadra2073 ShrawanChapter 8: Combined Power Plant8.2 Advantages of Combined Cycle
Enumerate the advantages of a combined cycle plant. With the help of a neat diagram, explain the principle of working of a combined cycle plant to enhance the efficiency of electricity generation.
- 2079 BaishakhChapter 8: Combined Power Plant8.2 Advantages of Combined CycleClick to unlock premiumSee the full question with a premium plan
Performance and Economics of Combined Cycle
2 questions- 2081 BaishakhChapter 8: Combined Power Plant8.3 Performance and Economics of Combined CycleClick to unlock premiumSee the full question with a premium plan
- 2078 BhadraChapter 8: Combined Power Plant8.3 Performance and Economics of Combined CycleClick to unlock premiumSee the full question with a premium plan