Micro-Hydro Power
EE 78501
Question 13
Question
2069 BhadraChapter 2: Hydrological and Demand Survey2.1 Plant Factor and Load Factor, Hydrograph and Flow Duration Curve, Hydrological Cycle, Matching Power Supply with Demand, Capability and Demand Survey, Methods of Finding ADF (Annual Average Daily Flow), Methods of Head Measurements, Methods of Flow Measurements, Load Demand Curves of Various Loads, Peak Demand Forecasting, Optimum Generating Installed Capacity, Geological Consideration
Give two reasons why capability and demand survey is carried out in the planning phase of micro hydro scheme.
Add an answerChecking contribution access...