CE 704 · Chapter 5
Hydropower Engineering past question
5.3 Intakes of RoR headworks: Location, Non pressure and pressurized intakes, General arrangement of intake, Control of bed load and floating debris in RoR intakes
How are the control of bed load and floating debris in ROR intake done? Explain with appropriate plan and sectional drawings of the system. [6]