CE 704 · Chapter 2

Hydropower Engineering past question

2.2 Stages of hydropower development: Reconnaissance, Pre-feasibility, Feasibility studies and detailed Engineering design

You are developing 300 MW reservoir type project in a river basin of Nepal. Briefly mention what steps you would follow from planning to commissioning of the project. [5]