CE 704 · Chapter 2
Hydropower Engineering past question
2.2 Stages of hydropower development: Reconnaissance, Pre-feasibility, Feasibility studies and detailed Engineering design
Differentiate between pre-feasibility and feasibility studies of a hydropower project with explaining the site specific hydrological and topographical investigations. [8]