CE 704 · Chapter 7

Hydropower Engineering past question

7.1.3 Selection of turbines and their specific speed, Turbine setting

Determine number of turbines and diameter of runner for a power plant having 23 cumecs inflow, 20 m head, turbine efficiency 85% and speed 170 rpm, specific speed 230 rpm and speed ratio 0.76. [6]

View all Hydropower Engineering questions