CE 704 · Chapter 3

Hydropower Engineering past question

3.1 Processing of hydrological data, Use of extreme and long term hydrological data, mass and elevation volume curves, flow duration curves

The stream flow record for a hydropower development site is given below. Draw a flow duration curve and determine firm and secondary energy if the available head is 60 m. design discharge capacity is 45 m³/s and overall efficiency is 82%. [8]

View all Hydropower Engineering questions