CE 704 · Chapter 3

Hydropower Engineering past question

3.4 Methods of fixing installed capacity of a hydropower plant

A hydropower project is planned to develop in a Nepalese River having net head of 150 m, turbine efficiency of 90% and generator efficiency of 95% with the monthly hydrograph as shown below:

Months Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
Q (m³/sec) 100 80 60 50 40 30 40 50 70 110 150 120

As an environmental flow, a minimum flow of 10% of each month is mandatory. If the storage project is designed with full regulation of annual hydrograph, find out: the capacity of the reservoir; installed capacity of the power plant, and annual energy generation. [3+2+3]